Work Details

Rows of solar panels on a ribbed metal warehouse roof at sunset

The logistics hub aimed to lower its carbon footprint while cutting the rising utility costs of warehouse operations and heavy equipment. As a strategic supply chain location, uninterrupted power and predictable costs were key requirements.

Our solution: a durable 150 kW commercial solar system with high-efficiency monocrystalline panels, remote monitoring and a robust inverter setup for maximum uptime. The design delivers both financial and operational efficiency across the whole facility.

Project Overview

Component
Description
System Size
150 kW
Payback Period
3.8 years
Industry
Supply Chain & Logistics
Installation Type
Rooftop-mounted Solar PV + Real-Time Monitoring System
Location
El Paso, TX

Installation Details

The system was installed over three weeks with minimal disruption to day-to-day operations. The rooftop array covers about 15,000 square feet, oriented to capture the most sunlight during peak business hours. Monitoring lets the facility managers:

  • Track real-time energy production.
  • Identify anomalies or downtime.
  • Optimize energy usage across shifts.

Key Results & Benefits

We also included a backup system consultation, paving the way for future battery storage.

  • Immediate Savings: Utility bills fell by over 45% in the first billing cycle.
  • Fast ROI: Break-even projected in under four years.
  • Increased Property Value: The facility's valuation rose with long-term energy independence.
  • ESG Improvement: The upgrade lifted the group's ESG metrics, boosting investor confidence.